Unic TANGO S duo Caractéristiques Techniques page 152

Table des Matières

Publicité

TANGO
"TANGO EQUIPPED WITH THE VERSION V 108 / V 115 / V 118"
INSTALLING THE NEW CPU
PROCEDURE
1. ∗DATA CARD: to get the information = code 4442 UPLOAD.
2. WAIT THE END OF THE OPERATION.
3. Switch off the machine = 0/1
4. Install the new turntable stop plate on the turntable.
5. Remove the old CPU, install the new CPU, relocks the clips «up and down »
6. Switch on the machine = 0/1
7. Wait the machine riches the temperatures and wait the end of auto-control.
8. Make the code 3331 = reset the counter.
9. Make the code 3332 = reset the cleaning cycle.
10. ∗DATA CARD: install the information = code 4441 DOWNLOAD.
11. WAIT THE END OF THE OPERATION.
12. ∗TECHNICIAN CARD: check the programme = CLOCK, hour / day / month / day of the
week.
13. ∗TECHNICIAN CARD: check the programme = TEMPERTURE: TV= TG= TC= ; press
+ TVS = 00 "if not steam'air" TVS= 62 "if steam'air"
14. ∗TECHNICIAN CARD: check the programme = DRAWER CAPACITY: 90; if the
machine is equipped with kit "direct evacuation" = 00
15. ∗ TECHNICIAN CARD: go into the programme = PACKING LEVELS make a value
blink and go out to provoke a auto-control 1 et 2
16. WAIT THE END OF OPERATION.
17. ∗TECHNICIAN CARD: go into the programme = GRINDERS SETTING adjust the
ground coffee and proceed to the calibration, setting 1 et 2
18. Go back to using function and remove the technician card.
19. Empty the coffee drawer, put it on and press "+"
∗ Use the technical book « TANGO TRAINING »
INSTALLING THE NEW CPU
V194, and more
2 November 2011

Publicité

Table des Matières
loading

Produits Connexes pour Unic TANGO S duo

Table des Matières