O & M Manual for the EGS Automatic
Transfer Switch with RTC-50 Control
7.4.1.7 100 A Service Entrance Breakers
SERVICE
ENTRANCE
BREAKERS
Figure 29. Service Entrance Breakers Installed (100 A SE ATS).
Step 1: Turn the utility (Source 1) power off and turn the genera-
tor (Source 2) control selector switch to the "OFF" posi-
tion before attempting to replace the service entrance
breaker.
Step 2: Disconnect the cables from the lugs on the service
entrance breaker.
Step 3: Remove the two (2) cables that connect to the contactor.
Figure 30. Stab Connections at the Service Entrance Breakers.
Step 4: Align the new service entrance breaker with the mounting
bracket.
Step 5: Reconnect the cables to the lugs on the service entrance
breaker.
Step 6: Apply utility (Source 1) power and place the generator
control selector switch in the "AUTO" position after the
service entrance breaker has been replaced. Test the
system for proper functionality.
IB00405003E - 70-8662
7.4.1.8 Dead Front
Figure 31. Service Entrance Deadfront Installed.
Step 1: Open the transfer switch door.
Step 2: Remove the two (2) screws securing the deadfront to the
Step 3: Insert new deadfront.
Step 4: Secure the new deadfront to the ATS enclosure using the
Step 5: Close the ATS door.
For more information visit: www.eaton.com
Instructional Booklet
Effective: July 2008
ATS using a blade screwdriver. Remove the enclosure
deadfront.
hardware supplied.