Salon™ Spa Bath

Drop-in Installation

Before you begin your installation, please read the following:
Observe all local and building codes.
Determine which tools will be used during the installation.
Additional bathtub drain parts and plumbing are commercially available at plumbing and hardware stores.
Drain/Overflow rough-in information is included with your bathtub in the installation instruction manual.
Complete the bathtub surround installation (Figure 8).
Install drain/overflow according to the
1
manufacturer's instructions. Refer also to the
Technical Specifications Manual.
Watertight installation of the drain is the installer's
responsibility. Drain leakage is excluded from the
Jacuzzi Luxury Bath warranty of this product.
Install the faucet at this time. It is recommended
2
that the faucet be installed by a qualified plumber.
Proper installation of the spout plumbing and
compliance with local codes are the responsibility of
the installer. Jacuzzi Luxury Bath does not warrant
connections of water supply fittings and piping,
fill systems, or drain/overflow systems. Nor is it
responsible for damage to the bathtub which may
occur during installation.
A non-flammable protective barrier must be placed
between the soldering work and the bathtub unit to
prevent damage to the bathtub.
Prepare the cut-out hole for the bathtub using
3
either the provided full scale template or the cutout
dimensions listed in the specifications table in the
Technical Specifications Manual.
The template may show guides for more than one
bathtub, be certain to select the appropriate guide
lines. If under mounting is an option, be careful to
select the guide lines that apply to the installation
that you are performing.
Complete all deck finish work and cover to protect
4
from damaging while placing the bathtub.
Insulation may be placed within the bathtub
5
surround.
Provide adequate ventilation around the blower
and motor/pump to ensure sufficient air flow and
cooling. Do not block blower intake for any reason.
Do not insulate the blower for any reason. Keep
blower clear of all debris.
Turn off power supply to dedicated GFCI protected
6
circuits.
Place a piece of scrap lumber on each of the ends
7
of the cutout – this will be used as a temporary
support prior to lowering the bathtub fully into the
opening (Figure 9).
Installation and Operation
Tile
Subfloor
Mortar or
Adhesive
Flashing
Tile or Finished
Surface
Scrap Lumber
Substrate
Support
Member
www.jacuzzi.com
Sealant
1˝ x 4˝
(25mm x 101mm)
Exploded View
Not For Support
Figure 8
Level Subfloor
Figure 9
Scrap Lumber
Minimum 3˝
(76mm)
Clearance
Page 15