Function, Application and Installation advice
The Eckerle fuel oil suction pump unit Sp32/01-10 is intended for the
EL according to DIN 51603 in the suction operation. The device lifts the
automatically. The supply to the appliance device can pursue in the
inlet operation with natural downward gradient (minimum 2%) or in the
suction operation from the oil burner pump. The pump takes over then
the function of an intermediate storage and/or a station.
line. It´s already built inside the pump. The built-in, open container works
as a oil ventilation. Therefore no additional ventilation on the consuming
device is necessary. Sketches of the installation options of the SP32-01
1.Technical Equipment
intake line, thermal safety monitoring, central detection system linked
to pre-programmed PCB, LCD display for function and breakdown
information, two line adapters with 'O' ring connectors 8 x 1, accessory
installation material. The 1.6l storage tank, piston pump as well as the
hydraulic connectors are installed over the integrated secutity oil catch
SP32-01 arrives fully assembled and factory tested.
2. Approvals and Safety Features
ciency safety device as well as a leakage monitoring for the safety catch
pan. Additional, time-oprated control systems supervise the function of
the integrated piston pump.
3. Wall Mounting
The pump is fastened horizontally by means of enclosed attachment
bracket with assembly material (± 2%) to a wall. Make sure that the
two absorption rubber pieces are located under the plastic clamping
free space upward and/or to a good accesibility for maintenance work.
The pump must be installed min. 25cm over the tank level, so that no
inlet pressures can occur. The oil lifter may only be operated in dry and
well-ventilated rooms. Outside installation are forbidden.
4. Pipe Installation
The SP32-01 is factory equipped with sucking and outlet ERMETO
screw connections for 8 x 1 CU pipes (ID 6 mm). When connecting the
CU pipes to the suction and outlet connecting piece it is to be made
certain, that no tensions at the connecting pieces result from bending the
lines, and downward gradient of at least 2% (with stove) is present. The
pipe installation must be implemented therefore expertly and carefully. If
the suction pump is installed more for than 3m over a stove, an oil pres-
sure-reducer must be inserted prior to the furnace automatic controller.
Note: - when bending the lines no cross-section contractions may
develop
- avoid over tightening on the pump connections
- when assembling the pipes pay attention to tightness
- the legal guidelines for pipe installation are to be kept
ELECTRICAL
Wattage
Fuse
40 W
0,5 A
HYDRAULIC
Max. suction height
7 m
5 l/h
4 m
7 l/h
5. Electrical Installation
The main connection socket, 230V, must have an earth protective groun-
and
ding. The suction pump is delivered completely ready for installation
with power supply plug according to VDE. The SP32-01 is secured by a
standard 0.5A fuse locaded on the board.
Legend:
A. Main oil tank
. The
B. Suction line Rohr dia. 6/8
C. Oil tank suction pump 1,6l
D. Safety catch pan
E. Cover
F. LCD-display
-
G. Start-up button
H. Main electrical plug
K Oil-pressure regulator
L appliance
M Check valve
- 4 -
GB
MECHANICAL
Reseve-
Gewicht netto
Storage
1,6 l
2 Kg

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eckerle sp32/01

Table des Matières