Télécharger Imprimer la page

BMS energy FK2000 Mode D'emploi page 11

Masquer les pouces Voir aussi pour FK2000:

Publicité

Montagehinweise
BMS energy
®
Assembly instructions
Istruzioni di montaggio
Instructions de montage
Instrucciones de montaje
General and transport instructions
The mounting system is suitable for tiled roofs only. Installation must only be carried out by qualified personnel.
The entire information in these instructions is intended exclusively for such qualified personnel. Only the supplied
material should be used for the installation. Prior to starting installation and operation of the solar collector sy-
stem, please inform yourself about the applicable local standards and regulations. The use of a carrying strap is
recommended for transporting the collector. The collector must not be lifted at the connections or on the threa-
ding. Avoid impacts and mechanical influences on the collector, in particular on the solar glass, the rear panel and
pipe connections.
Statics - tiled roofs
The collectors may only be mounted on sufficiently load-bearing roof surfaces and substructures. It is imperative
that the static load bearing capacity of the roof or substructure is checked in terms of local and regional conditions
prior to installation of the collectors by the customer, if necessary through the involvement of a structural engi-
neer. Particular attention should be paid to the quality of the (timber) substructure in terms of the stability of the
screw connections necessary for fastening the collectors. The checking of the entire collector structure by the cu-
stomer as per DIN 1055 part 4 and 5 or as per the applicable country-specific regulations is particularly important
in areas with heavy snowfall (note: 1 m³ powder snow ~ 60 kg / 1 m³ wet snow ~ 200 kg) or in areas exposed
to high wind speeds. The assessment should also take into account any particular circumstances at the place of
installation (foehn wind, air jets or eddy formation etc.) which can lead to increased loads. When selecting the
installation site it should be ensured that the maximum load is not exceeded either by snow or wind forces. As a
rule, collector arrays must be installed such that any possible collection of snow is prevented from reaching the
collectors by snow barriers (or through special forms of installation). The distance to roof ridges/edges must be
at least 1 m.
Note: Installing a collector array signifies an intervention into an (existing) roof. Roof coverings, e.g. tiles, shingle
and slate, especially in the case of converted and inhabited loft spaces or roofs with less than the minimum slope
(with regards to the covering) require additional measures by the customer, e.g. sarking membranes, as security
against water penetration caused by wind pressure and driving snow.
Lightning protection / Equipotential bonding of the building
In accordance with the lightning protection standard ÖVE/ÖNORM EN 62305 Part 1-4 the collector array cannot
be connected to the building's lightning protection. A safety distance of at least 1 m must be maintained from any
possible adjacent conducting object. For installations on metal substructures at the installation site, generally
qualified electricians must be consulted. To carry out a building potential equalisation, the metal tubes of the solar
circuit and all collector cases or fastenings must be connected to the main potential equalisation bus by a qualified
electrician in accordance with ÖVE/ÖNORM E 8001-1 or the country-specific standards.
Connections
Depending on the design, the collectors must be connected with one another and/or the connection pipes using
screw fittings (1" internal/external thread) with flat-face sealing. Ensure correct placement of the flat gaskets. If
flexible pipes are not used as connectors, precautions must be taken to protect the connection pipes against tem-
perature fluctuations caused by heat expansion, e.g. expansion bends and flexible piping (see Connecting the col-
lectors to one another/Operational recommendations). Larger collector arrays must be assembled with expansion
bends or flexible members inserted in the links. (IMPORTANT: check the pump design). When tightening the union
nuts, always balance (counter) the torque with a pipe wrench or another spanner to prevent damage to the absor-
ber.
Collector angle / General notes
The collector is suitable for angles between 15° (minimum) and 75° (maximum). The collector connections and the
ventilation openings must be protected against the penetration of water as well as against contamination through
dust etc.
Legal guarantee
Legal guarantee claims can only be made if the supplier's own antifreeze has been used and maintenance has been
carried out correctly. Installation by qualified personnel with absolute adherence to the instructions is a prerequisite
for the justification of claims.
info@bmspower.com
Montagehinweise
Assembly instructions
Istruzioni di montaggio
Instructions de montage
Instrucciones de montaje
© Es gelten ausschliesslich unsere allgemeinen Geschäftsbedingungen
D
I
F
GB
E
www.bmspower.com
DB-0
Seite 11 von 40

Publicité

loading