Installation; Mounting The Controller - Certikin CTX Consignes D'installation Et D'utilisation

Chlorateur de sel
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24

2.0 Installation

2.1 Mounting the Controller

Choose a location that is preferably out of direct sunlight, near the filter system. The controller should be located 1 metre
above ground level to prevent rain splash back or sprinkler system damage to the underside of the controller. The
controller must be mounted on a vertical surface/wall. If mounted on a post, a flat sheet 20mm larger than the controller
housing must be used.
a.
Mount the wall bracket using the screws provided on a secure wall.
b. Glue Chlorinator cell into line as per drawing below after filter, heater and solar (if installed
c.
Wire filter pump into Junction Box located in underside of Controller
d. Connect 4 wire cell cable ensuring matching colours.
e.
The cell must be installed with the barrel unions underneath and the cell should be horizontal. Both 40mm and
50mm fittings have been provided. Make sure that the O-rings are correctly fitted and the unions are done up
tightly. Flow direction through the cell is critical – refer to label on housing.
f.
Hang Controller on wall bracket and wire mains power supply lead into power supply.
Pool Pump
Water
from
pool
INST322 – CERTIKIN CTX SALT CHLORINATOR Instructions V02_14
Pool
Return
Filter
Heater
Pipe Centres
108mm
From
Filter/Pump
4

Publicité

Table des Matières
loading

Table des Matières