Télécharger Imprimer la page

Black & Decker Price Pfister Marielle 34 Serie Instructions De Montage page 4

Masquer les pouces Voir aussi pour Price Pfister Marielle 34 Serie:

Publicité

Les langues disponibles

Les langues disponibles

12
12A
12B
12 SIDE SPRAY INSTALLATION
,QVHUW WKH 6LGH 6SUD\ +RVH 12A) through the Hose Guide (12B  )URP
XQGHUQHDWK VLQN IHHG WKH 6LGH 6SUD\ +RVH 12A) back up through the center
hole of sink and through Mounting Ring (12C) so that it is above the sink.
STOP
4 HOLE INSTALLATION
13
13C
%27720 *5229(
13 INSTALLING DECKPLATE
Ensure that the Plastic Putty Plate (13A) is pressed on the Deckplate (13B).
Place a bead of plumber's putty in the groove along the outer edge of the Putty
Plate (13A). If desired, place a small bead of plumber's putty to the underside
RI WKH +RVH *XLGH )ODQJH 13C). Install the Deckplate (13B) and align the Hose
*XLGH )ODQJH 13C) over the holes in the sink.
14
14A
)
14B
14C
12C
Go To Step 16
13B
13A
14D
)
14E
14E
(1*/,6+
14 SECURING DECKPLATE & HOSE GUIDE
Insert Hose Guide (14A LQWR +RVH *XLGH )ODQJH 14B) and onto the sink hole.
)URP XQGHUQHDWK VLQN VHFXUH WKH +RVH *XLGH 14A) by screwing the Plastic
Locknut (14C  6HFXUH 'HFNSODWH 14D) by screwing Wing Nuts (14E) to
Mounting Posts (14F). Hand tighten. Caution: do not over-tighten. Remove
any excess putty from around the outside edge of Deckplate (14D).
15
15A
15B
15 SIDE SPRAY INSTALLATION
,QVHUW WKH 6LGH 6SUD\ +RVH 15A) through the Hose Guide (15B  )URP
XQGHUQHDWK VLQN IHHG WKH 6LGH 6SUD\ +RVH 15A) back up through the center
hole of sink and through Deckplate (15C) so that it is above the sink.
16
16C
16A
16 HOSE ATTACHMENT
&DUHIXOO\ WLJKWHQ WKH 6LGH 6SUD\ +RVH 16A WR WKH 6SUD\ 6XSSO\ 7XEH 16B)
ORFDWHG RQ WKH EDFN RI WKH )DXFHW %RG\ 16C).

15C
16B

Publicité

loading