Operation; Before Commissioning; Putting Into Operation; Compacting Fresh Concrete - TECMIX TBR 2000 Mode D'emploi Original

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Operation

3.1 Before commissioning

The unit is ready for operation after unpacking.
Check unit:
- Check the unit and all components for damage.
- Damage to the protective hose and the connection cable.
Check the mains supply:
-Check whether the mains supply or the building site distribution board has the correct
operating voltage (see type plate of the unit or chapter Technical data).
- Check whether the mains supply or the site distribution board complies with the applicable
national standards.

3.2 Putting into operation

Be sure to connect the individual components correctly.
Connect hose to machine until quick release engages.
Connect the concrete vibrator to the AC mains (230V/home connection) with the connection
cable.
Put the concrete vibrator into operation (set the switch to "ON" / "I").
Hit the vibrating bottle head part hard; so that the pendulum is activated.

3.3 Compacting fresh concrete

Hold the unit with both hands.
Dip the vibrating body quickly into the fresh concrete, dwell for several seconds and slowly pull
it out.
Immerse the vibrating body in all areas of the formwork and compact the fresh concrete..
28

Publicité

Table des Matières

Dépannage

loading

Produits Connexes pour TECMIX TBR 2000

Table des Matières