Drain Connection; Start-Up And Acceptance - Bartscher M 5230 Mode D'emploi

Masquer les pouces Voir aussi pour M 5230:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73

5.1.6 Drain connection

At the condensate-collecting tray located in
front of the oven, there is a drain hose (with
an inner diameter of 10 mm). This hose drains
excess liquids from the condensate-collecting
tray away and runs in the rear part below the
device (see A - picture on the right). To drain
the water to the drainage system, extend the
available hose as needed.
Fasten the supplied drain pipe to the outlet
hole located under the device to ensure the
outflow of liquids from the cooking
compartment.
The drain pipe must be connected with a suitable
hose (∅ 22 mm) to the drainage system.

5.1.7 Start-up and acceptance

Prior to activation of electrical devices, all inspections must be thoroughly conducted in
order to confirm compliance of the device and its installation with all legal, technical and
safety norms.
The following conditions must be fulfilled:
→ → → → The temperature around the installation must be above + 4 ° C.
→ → → → The cooking compartment must be empty.
→ → → → All packing elements must be completely removed, together with the
protective film on the internal walls.
→ → → → Ventilation ducts cannot be blocked in any way.
→ → → → Any elements of the device disassembled during installation must be
reassembled.
→ → → → The main electric switch must be turned on, and the water stopcock installed
by the device must be open.
A
- 53 -

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M 5110M 7110M 10110116612116616116618 ... Afficher tout

Table des Matières