Installation Instructions; Install Cooktop - Samsung NZ24T4360RK Manuel D'installation

Masquer les pouces Voir aussi pour NZ24T4360RK:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Before you make the electrical connection:
To properly install your cooktop, you must determine the type of electrical
connection you will be using and follow the instructions provided for it here.
• A 3-wire or 4-wire, single phase, 208 or 240 volt AC, 60-Hz, power supply is
required on a dedicated double pole circuit breaker of at least 30 amps.
NOTE
• The cooktop is rated 240 volt. Some models have a neutral (white) wire.
• The cooktop should be connected directly to the junction box through flexible,
armored or nonmetallic sheathed, copper cable. The flexible, armored cable
extending from the fuse box or circuit breaker box should be connected directly
to the junction box.
• Locate the junction box to allow as much slack as possible between the junction
box and the cooktop so that the cooktop can be moved if servicing becomes
necessarry in the future.
• Do not cut the conduit. Use the length of conduit provided.
• A UL listed or CSA approved conduit connector is necessary at each end of the
power supply cable (at the cooktop and at the junction box). A listed conduit
connector is already provided at the cooktop.
• If the house has aluminum wiring, follow the procedure below:
1. Connect a section of solid copper wire to the pigtail leads.
2. Connect the aluminum wiring to the added section of copper wire using
special connectors and/or tools designed and UL listed for joining copper
to aluminum.
Follow the electrical connector manufacturer's recommended procedure.
Aluminum/copper connection must conform with local codes and industry
accepted wiring practices.
Install_NZ24T4360RK_EN.indd 7

Installation instructions

Install cooktop

STEP 1 Place cooktop
Insert the cooktop centerd into the cutout
Cooktop
opening. Make sure the cooktop is parallel
to the front edge of the countertop. Make
final check that all required clearances are
met.
English 7
2020-06-18
12:05:34

Publicité

Table des Matières
loading

Table des Matières