DEJELIN SLJV4300BL Manuel D'instructions page 38

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

To install the strainer into
spinning brush
Strainer
assembly
NL
Juicing bowl
FR
Assembly of strainer onto juicing bowl.
All ribs (4 ribs in total) of strainer must
DE
be aligned with the lock of the juicing
bowl. The smoothie strainer and juicing
bowl assembly (for making frozen fruit
EN
smoothies) uses the same assembly
method as the other strainers. There are
four angles in 360°, where each rib of the
smoothie strainer must be aligned with
the lock of the juicing bowl.
The auger must be aligned in the
middle of juicing bowl, then push the
auger down into the correct position.
38
manuelSLJV4300BL-NL-FR-DE-EN.indd 38
A S S E M B L Y M E T H O D 2
Strainer
Spinning brush
Smoothies
strainer
Alignment
Auger
Juicing bowl
Input hopper
Juicing bowl
The lid of the component assembly.
As shown in fi gure 1.
• Place the hopper onto juicing bowl.
• Turn the hopper until it goes no further.
To install the juicing bowl onto the
main body
• Align the juicing bowl with the shaft.
• After the juicing bowl is installed, check
whether the lock marks are in alignment.
23/05/2016 09:39:22

Publicité

Table des Matières
loading

Produits Connexes pour DEJELIN SLJV4300BL

Table des Matières