Table Des Matières - Lifebreath PURE PERFORMANCE RNC Serie Guide D'installation

Table des Matières

Publicité

Table of Contents
Location ...................................................................................................................................... 2
Pre-Installation Notes ................................................................................................................... 3
Simplified Installation (Return/Return Method) ................................................................................ 4
Partially Dedicated System ............................................................................................................ 5
Fully Dedicated System ................................................................................................................. 6
Hanging Straps ............................................................................................................................ 7
Drain Connection ......................................................................................................................... 8
Grilles ......................................................................................................................................... 9
Grille Fittings .............................................................................................................................. 10
Lifebreath Weatherhood and Weatherhood Requirements ............................................................... 11
Dual Hood ................................................................................................................................... 12
Main Control Installation .............................................................................................................. 13
Mechanical Timers Installation ...................................................................................................... 14
Installation and Pairing of Repeaters: 99-RX02.............................................................. ................. 16
Installer Selectable High Speed Settings ....................................................................................... 16
Variable Speed Controller ............................................................................................................. 17
Installation and Operation of 20/40/60 Minute Timer: 99-DET01 .................................... ................. 18
Dimensional Model Drawings - 95/155 Models ................................................................................ 18
Dimensional Model Drawings - RNC5TPD/TPF/VS Models .................. .............................................. 19
Dimensional Model Drawings - 205 Models ..................................................................................... 20
Balancing the Airflows ................................................................................................................. 20
Determining the CFM ................................................................................................................... 21
Balancing Collar Instructions ........................................................................................................ 21
Balancing the Airflows with a Pitot Tube ....................................................................................... 22
Balancing the Airflow Using the Door Ports ................................................................................... 23
Airflow Reference Chart - RNC5 TPD/TPF Model ............................................................................. 24
Airflow Reference Chart - RNC155 ................................................................................................ 26
Airflow Reference Chart - RNC205 Model ....................................................................................... 28
Troubleshooting .......................................................................................................................... 30
Location - Installation Notes
Install the unit in a heated space that provides clearance for service access. A typical location is in
either a mechanical room or an area close to the outside wall within close proximity to where the
weatherhoods are mounted. If a basement area is inconvenient or non-existent, install the unit in a
utility room or laundry room.
Attic installations are not recommended due to
 The complexity of work to install
 Freezing conditions in the attic
 Difficulty of access for servicing and cleaning
If attic installation is necessary the unit must be situated in a conditioned space.
Leave sufficient clearance at the front of the access door for servicing the air filters and core. The
recommended clearance is a minimum of 25 in (635 mm) for opening and closing the door. Airia
provides four straps for hanging the unit from the basement floor joists.
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

072717

Table des Matières