Heat-N-Glo AT-GRAND Mode D'emploi page 12

Table des Matières

Publicité

Installing the Insert
WARNING: MAJOR U.S. BUILDING CODES
!
SPECIFY MINIMUM CHIMNEY AND/OR VENT
HEIGHT ABOVE THE ROOF TOP. THESE
MINIMUM HEIGHTS ARE NECESSARY IN THE
INTEREST OF SAFETY. SEE THE FOLLOWING
DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED
THE TERMINATION CAP IS AT LEAST 2-FEET
FROM A VERTICAL WALL AND 2-FEET BELOW
A HORIZONTAL OVERHANG.
Note: This also pertains to vertical vent systems installed
on the outside of the building.
f i r e - p a r t s . c o m
ROOF PITCH
Flat to 6/12
6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 9/12
Over 9/12 to 10/12
Over 10/12 to 11/12
Over 11/12 to 12/12
Over 12/12 to 14/12
Over 14/12 to 16/12
Over 16/12 to 18/12
Over 18/12 to 20/12
Over 20/12 to 21/12
Figure 2. Minimum Height from Roof to Lowest
Discharge Opening
(continued)
H (MIN.) FT.
1.0
1.25
1.5
2.0
2.5
3.25
4.0
5.0
6.0
7.0
7.5
8.0
Installation
(suite)
AVERTISSEMENT: LA PLUPART DES CODES
!
DE
CONSTRUCTION
PRÉCISENT LA HAUTEUR MINIMUM D’UNE
CHEMINÉE ET/OU D’UN CONDUIT DE VENTILATION
AU-DESSUS DU SOMMET D’UN TOIT. CES
HAUTEURS MINIMUM SONT NÉCESSAIRES POUR
DES RAISONS DE SÉCURITÉ. VOIR LE SCHÉMA
SUIVANT POUR LES HAUTEURS MINIMUM, À
CONDITION QUE LA MITRE SE TROUVE À AU
MOINS 61 CM (2 FT) D’UN MUR VERTICAL OU 61
CM (2 FT) EN DESSOUS D’UN SURPLOMB
HORIZONTAL.
REMARQUE: Ces dimensions s’appliquent aussi aux
systèmes de ventilation installés à l’extérieur d’un
bâtiment.
Pente du toit
plat à 6/12
de 6/12 à 7/12
de 7/12 à 8/12
de 8/12 à 9/12
de 9/12 à 10/12
de 10/12 à 11/12
de 11/12 à 12/12
de 12/12 à 14/12
de 14/12 à 16/12
de 16/12 à 18/12
de 18/12 à 20/12
de 20/12 à 21/12
Figure 2. Hauteur minimum du toit à l’orifice
d’échappement le plus bas
8
AMÉRICAINS
H (min.) cm
30,5 cm
38 cm
45,75 cm
61 cm
76,25 cm
99 cm
122 cm
152,5 cm
183 cm
213,5 cm
228,75 cm
244 cm

Publicité

Table des Matières
loading

Produits Connexes pour Heat-N-Glo AT-GRAND

Table des Matières