Wiring Diagrams - Guest CHARGEPRO 1.5 Manuel Du Propriétaire Et Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WIRING DIAGRAMS

13
Ignition Protected On-Board Installed Applications
Ring Terminal Cable Installation for Mounting the ChargePro
a Boat or Under a Hood Requiring Ignition Protected Installation.
ChargePro
Dual Use Maintainer
and Charger
Ring terminal cable assembly
_
12 Volt Engine Battery
1.5 On-Board
Note:
Indicates fuse
1.5 Amp
Top view
of battery
bat 1
+
For Ignition Protected Applications
Terminal Cable Assembly Only
The ChargePro
1.5 Dual Use Maintainer and Charger can be permanently mounted on-board,
and can be mounted vertically or horizontally. (vertically is recommended for LED viewing)
Only use the ring terminal cable assembly for on-board and ignition protected
applications.
Always mount your ChargePro
1.5 in a compartment area that can be properly ventilated
during use.
Do NOT make any electrical connections to the ChargePro
steps are completed:
10 Easy to follow installation steps (after removing mounting hole covers):
1. Select a mounting location that allows for free air ventilation with a minimum of 4 inches of clear
unobstructed space around and in front of the ChargePro
compartments and ventilate for at least 15 minutes before starting the installation of the ChargePro
2. Confirm the DC battery cable can reach the battery for proper connections. Confirm the LEDs
are viewable.
3. Using the ChargePro
1.5 as a mounting template, use a small awl or screwdriver to
mark the position of each mounting hole or tape the template in the mounting area
to drill the pilot holes.
4. Using a 1/8" drill bit, drill pilot holes in the (2) marked locations as described in step 3.
Apply a silicon sealer in each of the mounting locations to waterproof the screw holes.
5. Position the ChargePro
1.5 over the mounting holes and secure with a power screwdriver
by installing 2 marine grade or #6 x 1" stainless steel screws. (mounting screws not included)
INSTALLATION
On-Board Installation with Ring
1.5 or batteries until the following
1.5. Open all battery and engine
1.5.
1/8" pilot hole
with silicon sealer
IMPORTANT NOTICE
Confirm the surface you will be
mounting the ChargePro
1.5 to
is adequate in strength and
thickness to hold the ChargePro
1.5 in place with the mounting
screws you have selected.
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2701a

Table des Matières