England's Stove Works 28-4000 Guide D'installation Et D'utilisation page 27

Appareil de chauffage au bois supplémentaire
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

•  USE an approved wall thimble when passing through a wall and a ceiling support/fire stop 
when passing through a ceiling. 
•  INSTALL three sheet metal screws at every chimney connector joint. 
•  AVOID  excessive  horizontal  runs  and  elbows,  as  both  will  reduce  the  draft  of  the  venting 
system and will result in poor stove performance. 
•  INSPECT your venting system often, to be certain it is clear of creosote, fly‐ash and other 
restrictions. 
•  CLEAN the venting system as detailed in the maintenance section of this manual. 
•  ADHERE to the 10‐3‐2 rule regarding chimney terminations. 
•     INSTALL single wall chimney connector with the male end down to prevent creosote leakage. 
Follow double wall chimney connector manufacturer's instructions regarding proper pipe 
installation. 
WARNING: Venting system surfaces get HOT, and can cause burns if touched.  Noncombustible 
shielding or guards may be required 
 
 
The 10‐3‐2 Rule: The chimney system must terminate 3.0 ft above the point where it's centerline 
passes through the roof AND the chimney must terminate 2.0 ft. above part of the dwelling within 
a 10 ft. radius of the chimney. 
 
Operation and Maintenance – Please refer to the 'Operation' (Operating Instructions) and 
Maintenance (including Ash Removal/Disposal) sections of your owner's manual and 
follow the guidelines listed therein for safety and for optimal emissions performance. 
Additional Information: 
Following the instructions in your owner's manual for Building a Fire will ensure a proper fire, as 
well as helping minimize visible emissions.   
 
More: 
Fuel loading and re‐loading: Practical Tips for Building a Fire – See your owner's manual for 
information on loading (and re‐loading) your fuel, as well as for fire‐starting procedures 
(i.e. 'Building a Fire').  
Top‐Down Fires: The US EPA recognizes 'the effectiveness of the top‐down approach for 
starting fires.' A good tutorial for this approach may be found at http://woodheat.org/top‐
down‐steps.html .  When building top‐down fires, be sure to follow the instructions found 
in your owner's manual and contact our Technical Support if you have any questions. 
 
Fuel Selection: Once your wood‐burning appliance is properly installed, building an 
effective fire requires good firewood (using the right wood in the right amount) and good 
fire building practices. The following practical steps will help you obtain the best efficiency 
from your wood stove or fireplace.  
 
Season wood outdoors through the summer for at least 6 months before burning it. 
Properly seasoned wood is darker, has cracks in the end grain, and sounds hollow when 
smacked against another piece of wood.  
Store wood outdoors, stacked neatly off the ground with the top covered. 
Burn only dry, well‐seasoned wood that has been split properly. 
Start fires with newspaper and dry kindling as discussed earlier in the manual.  
Page | 27

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

50-shw4050-trw40

Table des Matières