IDRO IDRODUE 27 R Instructions D'installation page 21

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

POSITIONING OF THE FRONT FIXATION
Depending on the type of the gate (wood, iron, aluminium) the front fixation can be welded
or screwed (Fig. 6).
Mount the front fixation so that it guarantees the perfectly horizontal position of the
operator (Fig. 7).
N.B.: Ensure that when the door is fully open and fully closed the rod is not at the end of
its stroke, but is at least 15mm from the end of its stroke on each side.
Fix the IDRO and try several times to open and to close the gate, controlling that the cover
does not touch the moving gate, otherwise you have to readjust the ancorage on the gate.
In the case you have a wall parallel with the open gate, you must provide a niche in which
to place the operator.
IDRODUE 27
INSTALLATION OF THE CHROMIUM-PLATED ROD PROTECTION
Make sure to have inserted the antivibration plastic frame (A) before inserting the rod
cover extrusion (Fig. 8).
REMOVING THE VENT SCREW
Unscrew the screw "A" and remove the vent plug "B" at the end of the installation procedure.
It is mandatory to remove the vent screw at the end of the installation
Grau (Öffnung)
On
Gelb (schließend)
BY-PASS-VENTILE
Under
-
-
+
+
Grau
Gelb
IDRODUE 27 - MEASUREMENT OF THE OIL LEVEL AND TOPPING UP
70 mm
46 mm
46 mm
46
mm
PLASTIC RELEASE MOUNTING
ATTENTION: the mounting of the plastic release must be effectuated as shown in Fig. 9 only
and exsclusively after havingfinished all the instalaltion operations, mounting of the rod
cover and calibration of the by-pass valves.
8
B
21
70 mm
70 mm
Livella
COVER FOR
BY-PASS VALVES
A
G
B
70 mm
6
7
MECHANICAL STOP
OF THE RELEASE
9
10

Publicité

Table des Matières
loading

Table des Matières