Panel With Isolation Switch: Feed And Load Wiring - Lutron Softswitch128 Guide D'installation

Masquer les pouces Voir aussi pour Softswitch128:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
Wiring
(continued)

Panel with Isolation Switch: Feed and Load Wiring

(230/220-240 V
Typical
switch leg
Switched Hot/Live
#14-#10 AWG
(2.5-4.0 mm
)
2
Load
Load Neutral
#14-#10 AWG
(2.5-4.0 mm
)
2
Wire Sizes
230 V
#14-#2 AWG (2.0-35 mm
220-240 V
#14-#10 AWG (2.0-4.0 mm
12 Installation Guide for Switching Panels
only)
Bypass jumpers -
do not remove
L
SL
N
L
SL
N
L
SL
N
L
SL
N
Ground bus
2
)
2
)
• Wire the switching panel similar
• Run feed and load wiring. No
• Wire all loads.
• Leave the bypass jumpers in
• Use branch circuit breakers at
Main feeds:
Phase A, B, C, and Neutral
Wiring Tips
to wiring a lighting distribution
panel.
other wiring or assembly
required.
The switching panel can provide
temporary lighting:
place.
the distribution panel to switch
lights on and off.
R

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Softswitch128 xpsGrafik systemsGrafik systems xp

Table des Matières