Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1

3 Installation

Package Contents
Wiring installation guide
CAUTION
Only a licensed and expert electrician is authorized to install the Battery Charger BOX.
Picture 1
Picture 2
CAUTION : tighten screws to avoid electric arc.
CAUTION : fix L1/L2 to the charger box through the cable ties (A4).
CAUTION : Assembly the terminal cover and fix it to the charger box by screw (picture 3).
Battery Charger 240V
Picture 3
1. Switch off all the power sources that supply
UPS, battery banks and chargers. Ensure
that the Battery Charger is unplugged.
2. Turn off the battery banks breakers.
3. Remove the terminal cover by means of a
screwdriver (picture 1).
4. Connect the battery cables (L1 for DAKER
DK range or L2 for Keor S range) to the
battery box terminal (picture 2).
Make sure +/- wires position is correct (not
reverse no short circuit).
11

Publicité

Table des Matières
loading

Table des Matières