Kohler STERLING Finesse 5700 Serie Guide D'installation page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Longer edge
towards
outside of
shower
Wall jamb must sit flat
against wall and fully
engage bottom track
3. Locate Wall Jambs
- Place a wall jamb down over end of bottom track.
NOTE: Wall jamb must sit flat against the wall with the legs of jamb fully engaged with bottom track.
- If the jamb is not fully engaged with the bottom track, use a file to shape the bottom end of wall jamb to fit the
curve at side wall of bath/shower.
- Repeat steps to locate second wall jamb on opposite wall.
4. Mark and Drill Hole Locations
CAUTION: Risk of injury. Wear safety glasses while cutting materials.
- Use a level to plumb the wall jambs and mark the three hole locations.
- Remove wall jamb and lightly center punch the hole locations.
NOTE: On ceramic tile, use the center punch to nick the surface glaze. Tap the punch lightly with your hammer
so you don't crack the tile.
- Drill all three holes with a 3/16" drill bit. Use a masonry bit for ceramic tile.
- After drilling, thoroughly clean the bath or shower ledge and insert plastic anchors into the three drilled holes.
- Repeat steps above for the other wall jamb.
Sterling
Wall Jamb
Bottom Track
Mark
holes
Level
Wall Jamb
Bottom Track
5
Drill holes
Insert
anchors
C
1017313-2-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sterling finesse 5766Sterling finesse 5766mSterling finesse 5771Sterling finesse 5771mSterling finesse 5776Sterling finesse 5776m ... Afficher tout

Table des Matières