AKO PLATINUM PV-Monitor Instructions D'installation Et D'emploi page 42

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
PLATINUM PV-Monitor
Operation
Note
Note
Note
14
Installation and operating manual: PLATINUM PV-Monitor
Date 02/2009
Mat.-No. 717 553
To show original scale and zero-point of the diagram axes:
 Right-click to open context menu.
 Select Cancel all zoom or turn actions.
PV-Monitor saves read out data on the PC. It is possible to display
power and yield for all saved data. At the initial data readout from the
inverters, PV-Monitor shows the power progress of the last 30 days
at most. For any previous days, PV monitor only shows the yield.
Reporting
Î
power
t
Show power of selected inverters.
t
measuring unit: W
Î
yield
t
Show the yield of the selected inverters.
t
measuring unit: kWh
Î
selection
t
Select inverter for graphic evaluation.
The active selection is highlighted in blue.
Period
 Select complete system.
Î
day
t
Limit the evaluation period to a day.
Î
week
t
Limit the evaluation period to a week.
Î
month
t
Limit the evaluation period to a month.
Î
Year
t
Limit the evaluation period to a year.
Î
period selection
t
Select evaluation period.
Update view
Î
Update view
t
(5) PV-Monitor shows the latest of the currently transmitted
data corresponding to the selected period.
t
(…) PV-Monitor shows the saved data corresponding to the
selected period.
Changing the period cancels the selection of update view.

Publicité

Table des Matières
loading

Produits Connexes pour AKO PLATINUM PV-Monitor

Ce manuel est également adapté pour:

717 553

Table des Matières