AKO PLATINUM PV-Monitor Instructions D'installation Et D'emploi page 36

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 56
PLATINUM PV-Monitor
Operation
Note
8
Installation and operating manual: PLATINUM PV-Monitor
Date 02/2009
Mat.-No. 717 553
Inverter search
Fig. 1
Screen Inverter search
If inverter search is not required or to open the demo plant:
 Click on Cancel.
 PV monitor opens demo plant.
If inverter search and reading of current data is not required:
 Click on No.
Screen Current of the demo plant appears.
To perform an inverter search and read out current data:
 Click on Yes.
PV monitor starts inverter search.
Status line indicates current status.
If PV-Monitor cannot find an inverter:
Î
It is possible to use PV-Monitor with a limited functional range.
Î
Exclusively data saved in the PV-Monitor database are available.
If PV-Monitor finds one or several inverters:
Î
It is possible to use PV-Monitor with the complete functional
range.
Î
PV-Monitor reads out inverter data.
To display the readout data:
 Select register Settings.
Î
Set up a new PV plant in PV-Monitor (see 6.7 Settings).
PV-Monitor loads current inverter data every 10 minutes.

Publicité

Table des Matières
loading

Produits Connexes pour AKO PLATINUM PV-Monitor

Ce manuel est également adapté pour:

717 553

Table des Matières