Assembling The Shearing Plant; Assembly Height Of The Wall Mounting; Assembling The Rigid Drive Downtube Or Flexible Drive; Switching The Shearing Plant On / Off - Heiniger EVO 3 Traduction De La Notice Originale

Masquer les pouces Voir aussi pour EVO 3:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
3.4

Assembling the shearing plant

Pay attention to sufficient fastening of the shearing plant.
3.4.1

Assembly height of the wall mounting

Fix the wall mounting in such a way that a gap of approximately 10 to 25 mm
remains between the end of the rigid drive downtube (or flexible drive) and
the working area (Diag. 4, pos. c). In doing so take into consideration the
type of application cited below.
If the plant is to be operated with the rigid drive downtube or flexible drive,
the shearing plant is assembled in accordance with Diag. 4, pos. b. If the
plant is to be operated with a flexible drive then it can also be suspended
on a rope (Diag. 3).

3.4.2 Assembling the rigid drive downtube or flexible drive

Release the quick release (pos. 54, Diag. 6).
X
Push the coupling tube of the flexible or the solid drive downtube into the
X
downtube bush of the shearing plant.
Start and stop the motor while at the same time push the coupling tube
X
upwards to the mark.
Ensure the coupling tube is in the correct position with the mark and se-
X
cure the flexible or solid drive by means of the quick release mechanism.
CAUTION!
Check that the flexible or solid drive is securely fixed by the quick
release mechanism and located correctly before use.
3.5

Switching the shearing plant on / off

CAUTION!
Make sure that the ventilation holes are always clear (Diag. 6,
pos. a + b). The shearing plant must never be switched on when it
is lying on flat ground as the cooling air flow would be interrupted
and the motor could burn out (Diag. 6, pos. b).
EVO Shearing Plant – Translation of the original instructions
9

Publicité

Table des Matières
loading

Table des Matières