OBO Bettermann UDHome2 BV Instructions De Montage page 24

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
Performing the electrical installation
R emove the mounting cover and open the
hinged lid .
I nsert strain reliefs in front of the installation
pipe .
I nsert the connection cables approx . 150–
200 mm and fix them by pushing the strain
relief together .
E ngage the Modul 45 connection elements
(e .g . sockets) into the mounting support as
shown and connect them . Also connect the
PE connection of the service unit .
B end the separation panel downwards by
90° (1.), insert the socket in the service unit
(2.) and screw it tight (3.) .
Applying the floor covering and adjusting
the height
Apply the floor covering, leaving an ex-
pansion joint of 1–5 mm to the service unit .
a nd Adjust the height of the top edge of
the service unit, so that it is flush with the top
edge of the floor covering . To do so, unscrew
the four height adjustment supports accord-
ingly, using a slotted screwdriver .
24

Publicité

Table des Matières
loading

Table des Matières