Electrical connection

ATTENTION
The highest allowed net impedance at the electrical connection
point (refer to technical data) is not to be exceeded. In case of
confusion regarding the power impedance present on your con-
nection, please contact your utilities provider.
Note: Operating procedures create short term power sinkings.
During unfavorable net conditions other devices might be dis-
turbed.
– For connection values, see technical data and type plate.
– The electrical connections must be done by an electrician ac-
cording to IEC 60364-1.
– Current-carrying parts, cables and appliances in the working
area must be installed in a defectless state and must be pro-
tected against water sprays.
DANGER
To avoid accidents due to electrical faults we recommend the use
of sockets with a line-side current-limiting circuit breaker (max.
30 mA nominal tripping current).
Firmly installed electrical connection
 Establish the electrical connection.
A main switch that can be locked (figure 3 - item 6) is to be in-
stalled at a safe and easily accessible place to switch off the sta-
tionary high pressure cleaner.
The contact opening of the main switch must be minimum 3 mm.
Electrical connection with plug/ socket
 Install Cekon plug on the connection cable of the appliance.
 Insert Cekon plug into the socket.
To switch off the stationary high pressure cleaner, the Cekon plug
must be easily accessible so that it can be removed from the
mains.
38
The device is set in the factory as a natural gas device to gas
type G 20 and as LPG device to G 31. While switching over nat-
ural gas devices to G 25 or other natural gases (see type plate)
or the LPG device to G 30 or other LPGs (see type plate), the
natural gas exhaust values in case of natural gas devices and
the LPG exhaust values in case of LPG devices are to be set ac-
cording to the service information.
The enclosed empty type plate will be filled up with values of the
new gas type that is set and will be fixed on the right side of the
device in the address field. At the same time, the plate with the
G 20 (natural gas device) details or G 31 (LPG device) details fit-
ted at the factory must be removed.
 Check gas connection.
ATTENTION
Risk of damage to the appliance on account of over-heating.
 Connect the siphon to the boiler floor and fill water.
 Fill the boiler via the chimney opening with 4 litres of water.
 Before using for the first time, cut off the tip of the lid of the oil
tank on the water pump.
Measures to be taken before start-up
Figure 3 - Pos. 14
Note: The EASY!Lock system joins components with a quick-fas-
ten thread solidly and securely with just one turn.
 Connect the high pressure hose with the hand-spray gun and
the spray pipe and connect it to the high pressure outlet of the
appliance or the high pressure pipe network.
 Fasten the nozzle mouth-piece (b) with the union nut (a) on
the spray pipe (d). Please ensure that the sealing ring (c) is
cleanly positioned in the nut.
16
-
EN

Initial startup

a
b
c
d