ENG
8. SYNCHRONISATION OF TWO OR MORE POWERCONTROLLERS
The operation of two or more lamps can be synchronised by managing the Master and Slave functions of the Powercontrol.
One Powercontrol must be set as Master and all the others as Slave (see paragraph 7). All Powercontrol must be connected to each other via Sync
Cable (optional) as in the diagram in figure 8.