Installation; General Operation; Display; Parameter Setting - Izzo VIVI PID PLUS Manuel D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ALL NECESSARY CHANGES TO THE PRODUCTS, DICTATED BY LEGISLATIVE,
INDUSTRIAL, COMMERCIAL OR AESTHETIC PURPOSES.

4. INSTALLATION

Install the machine on a well-levelled, dry, smooth, and sturdy
supporting surface in a well-ventilated area.
Before using the coffee machine, make sure that:
• the dispensing lever is facing downward (fig. 6, tab. 1);
• the water and steam knobs are closed (fig. 4 and 5, tab. 1);
• the switch is in the "0 " or "OFF" position (fig. 10, tab. 1);
• the lower drip tray is correctly positioned (fig. 7, tab. 1).

5. GENERAL OPERATION

5.1 DISPLAY

The machine is equipped with a display that provides the instructions
required for operation (Fig. 1, Tab. 1).
The display consists of an LED and two keys
it. The picture below shows the DISPLAY of the machine.

5.2 PARAMETER SETTING

The LED on the display flashes when the heating element is operating.
RESERVES THE RIGHT TO MAKE
used for interacting with
8

Publicité

Table des Matières
loading

Table des Matières