Napoleon Ascent X 36 Série Manuel D'installation page 32

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

rough framing
EN
note:
For heavier fi nishing materials such as marble, we recommend adding extra support to the frame. Ensure
there is adequate fl oor support for the appliance and fi nishing material.
Before framing your appliance, determine vent requirements before deciding the fi nal location of the appliance.
After rough framing, place the appliance in its fi nal position.
* Based on 1/2" fi nishing material thickness.
32
W415-1849 / A / 03.06.19
A
Ref
Minimum rough framing dimensions
A
B
B
16"* (40.6cm)
35 1/2" (90.2cm)

Publicité

Table des Matières
loading

Table des Matières