Initial Operation; Suspending The Tool; Compressed-Air Connection - strapex STR 64 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Strapex STR 64
5

5.1 SUSPENDING THE TOOL

If the tool is equipped with a suspension bow (3/1) it
can be suspended on a spring balancer. By mounting
an M6-eye bolt (3/2) it is possible to perform horizon-
tal strapping.

5.2 COMPRESSED-AIR CONNECTION

Motor and sealing piston are lubricated by oil mist of
the compressed air. Properly prepared compressed
air is therefore essential for trouble-free operation of
the tool. This can only be ensured by a reliably func-
tioning maintenance unit, consisting of water separa-
tor, pressure reducing valve with pressure gauge and
oil mist lubricator.
The oil mist lubricator should supply sufficient oil.
The length of the hose between the STR 64 and the
maintenance unit should not exceed 5 m (15 ft). The
internal diameter of the pipe should be at least 10 mm
(
/
"). It must be ensured that the hose does not form
3
8
loops, where oil can collect.
16

INITIAL OPERATION

1
Fig. 3
2
12.11

Publicité

Table des Matières
loading

Table des Matières