Technical Data; Opening And Closing The Light Fitting - CEAG EXIT Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Safety instructions:
Forskilled electricians and instructed personnel in
accordance with national legislation, including the
relevant standards and, where applicable, in acc.
with IEC 60079-17 on electrical apparatus for
explosive atmospheres.
The light fitting must not be operated in zone 0 or
20 hazardous areas!
The technical data indicated on the light fitting are
to be observed!
The requirements of the EN/IEC 60079-31
regarding excessive dust deposits and temperature
to be considered from the user.
Changes of the design and modifications to the
light fitting are not permitted!
The light fitting shall be operated as intended and
only in undamaged and perfect condition!
Only
genuine
CEAG/Cooper
GmbH (CCH) spare parts may be used for
replacement!
Repairs that affect the explosion protection (see
national standard), may only be carried out by
CEAG/CCH or a qualified "electrician"!
Do not keep these operating instructions inside the
light fitting during operation!
The national safety rules and regulations for
prevention of accidents and the following safety
instructions which are marked with an (
operating instruction, will have to be observed!
2.
Conformity with standards
The light fitting is suitable for use in zone 1, 2 and 21,
22 hazardous areas acc. to EN/IEC 60079-10-1 and
EN/IEC 60079-10-2.
It has been designed, manufactured and tested
according to the state of the art and according to EN
ISO 9001:2000.
The light fitting is conform to the standards specified
in the EC-Declaration of conformity, enclosed
separately.
Address
Address
switch 1
switch 2
0
0
0
1
0
2
1
0
1
1
2
0
2
1
9
9
Fig. 4 Addressing EXIT CG-S
4
Cooper Crouse-Hinds GmbH
3.

Technical data

EC type examination certificate:
Category of application aacd 94/9/EC. and directive:
+ 40 °С:
ATEX
ta
max
ta
+ 50 °C:
max
IEC
ta
+ 40 °C:
max
ta
+ 50 °C:
max
Rated voltage AC:
EXIT 24 V
EXIT
EXIT CG-S
Rated voltage DC
EXIT 24 V
EXIT
EXIT CG-S
Rated frequency:
Rated current
Crouse-Hinds
110 V AC/DC:
220 V AC/DC:
Insulation class accd EN 60 598:
Degree of protection
accd. EN 60529
Operation temperature:
(Deviating temperatures possible with special versions)
Storage temperature in original
packing
) in these
Weight
Supply terminal clamping capacity
2 x per terminal:
Ex-e cable entry standard version M20x1,5 for cable
Metal thread:
Test torque for M 20 x 1.5 Ex-e
cable entry:
Test torque for pressure screw:
* max. permissable tolerances accd. EN 60079-0
4.
Installation EXIT
The respective national regulations as well as the
general rules of engineering which apply to the installation and
operation of explosion protected apparatus will have to be
observed!
Transport and storage of the luminaire is permitted in original
packing and specified position only!
4.1

Opening and closing the light fitting

Luminaire
Unscrew the four screws of the cover.
address
The cover can be opened to the molded hinges. For ease of
Monitoring off
installation, the cover can be removed out of the hinges. If
putting down take care to prevent scratches on the silk screen
cover.
1
4.2
Installation of the fitting
2
The luminaire shall be fitted by using the four mounting clips
with suitable fixing screws (Ø 5 mm, fig. 1) onto a suitable
10
surface.
11
4.3 Mains connection
Open the cover as described.
20
Pass the cable (5.5 to 13 mm) through the certified Ex cable
entry M 20 x 1,5. Use both sealing inserts for cables from 5.5 to
not permissable
8 mm, and the outer sealing insert only for cables from 8 to 13
mm. Pay attention to the proper fit of the remaining sealing
insert in the certified cable gland.
not permissable
In case of unused cable entries, remove their protective cover and
close the entries with a blanking plug (torque of 2.5 Nm). When
closing the gland with a blanking plug, always use both sealing
inserts! When metal cable entries are used, the protective caps of
the unused entries are to be removed and the entries to be closed
with certified Ex blanking plugs!
BVS 09 ATEX E 029
II 2 G Ex e ib mb IIC T6 Gb
II 2 G Ex e ib mb IIC T5 Gb
II 2 D Extb IIIC T80°C Db IP66
Ex e ib mb IIC T6 Gb
Ex e ib mb IIC T5 Gb
Ex tb IIICT80°C Db IP66
non-permissible
110 V - 277 V*
220 V - 254 V
12 - 24 V DC ± 20%
110 V - 250 V*
195 V - 250 V*
50 - 60 Hz
0,05 A
0,025 A
1
IP 66
-20°C to +40°C/ 50°C
-40°C to +80°C
approx. 2.2 kg
2
3 x 2,5 mm
ø 5,5 to 13 mm
M20x1.5
3,75 Nm
2,5 Nm
(for sealing off the cable or
the blanking plug)
Attention!
Only fix laid cable may be used for connection! If
cable glands from other manufacturer are used the
instructions regarding strain relief and clamping
capacity must be observed!
Connect the conductors to the terminals L, N and PE in
accordance with the terminal marking (see fig. 2).
Remont the LED-printed board into the housing. Take
care not to pinch any conductors. Install the protective
cover with the four screws. Tighten the screws only
hand-tight!
5.
Monitoring (only EXIT CG-S)
The CG-S module monitors and indicates to the
connected CEAG emergency supply system the operation
of the supply unit circuit and the function of min. 50 % of
the installed LEDs.
The CG-S module allows single monitoring of these
luminaires in CEAG emergency lighting systems. The
switching
mode
(maintained/non-maintained
switched emergency luminaires) is freely programmable
and mixed operation up to 20 addresses in a single circuit
is possible.
5.1
Addressing
Before fitting the cover, the addressing of the individual
luminaires is to be carried out. The desired address (fig.4,
1 - 20) is set on the address switch by means of a suitable
screw driver (Arrowhead to No., fig. 3). If the luminaire
should not be monitored the code 0/0 has to be selected.
The standing luminaire EXIT and is not equipped with
monitoring circuit and can not be addressed.
6.
Taking into operation
Prior to operation, check the light fitting for its
proper functioning and installation in compliance with
these operating instructions and other applicable
regulations!
Only carry out insulation measurements between PE
and the external conductor L as well as between PE and
N.
-
measuring voltage: max. 1 kV AC/DC
-
measuring current max. 10 mA
Mind: There must no insulation measurement be
carried out between L andN, since that would destroy
the electronics (mains input fuse in the unit).
7.
Maintenance
Observe the national regulations applicable to the
maintenance, servicing and test of apparatus for
explosive atmospheres e.g EN 60079-17 as well as the
general rules of engineering!
7.1
Servicing
When servicing, in particular those components that
affect the explosion protection, will have to be checked,
e. g.:
Housing and protective bowl for any cracks or
damages.
Gaskets for their perfect condition.
Terminals and blanking plugs for their firm fit.
Because of the risk of an electrostatic charge, the
light fitting shall only be cleaned with a damp, non-
fibrous cloth or sponge!
Only use customary household washing-up liquid diluted
in water as specified! The water temperature may be max.
50°C.
After that, rinse with clear water to prevent the risk of
tension cracks in the protective bowl!
7.2
Repair
Prior to replacing or removing any components, observe
the following:
Cut the apparatus off the voltage before opening it or
carrying out repairs! Only use certified genuine
CEAG/CCH spare parts! (See CEAG/CCH spare parts
list).
Subject to alteration or supplement of this product
series.
Regarding waste disposal, observe the relevant national
regulations! The plastic materials are marked with
material identifications.
and

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Exit 24 vExit cg-s

Table des Matières