Control Box Positioning - Ultraflex B 310 Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ULTRAFLEX

3.6 Control box positioning

1
To make sure the box can be installed in the desired position see the overall dimensions indicated
in section 1.2. The mechanism with the cables connected must be installed inside the boat bulkhead.
WARNING
Avoid bending the cables too tight (Minimum radius: 200 mm (8").
We recommend using ULTRAFLEX cables.
2
After choosing the right position, drill
to insert the control box using the suitable
template.
3
Remove
bezel
(A1) from the front
part of the control
box. Then remove
the
4
fastening
screws (2) and sepa-
rate flange (3) from
mechanism with hub
(A).
A1
5
Fix
mechanism
with hub (A)
to flange (3)
using
screws (2).
2
page 14
of 63 -
SINGLE LEVER CONTROL B310
A
3
2
A
3
Installation and maintenance manual
4
Fix flange (3) using screws (B), washers
(D), nuts (C). The flange should be positioned
in such a way that the slit (x) is aligned with
the sliding element in the control lever that
provides the locking in neutral.
x
B
WARNING
The flange must be assembled so that the slit
(x) is on the upper side.
C
D
3

Publicité

Table des Matières
loading

Table des Matières