entrematic Ditec Traffic C Manuel D'installation, D'entretien Et D'utilisation page 50

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9. MAINTENANCE TO BE CARRIED OUT EVERY 6 MONTHS
Regular inspections should be made according to national regulations and product documentation by a Entrematic Group AB
trained and qualified technician. The number of service occasions should be in accordance with national requirements and
product documentation.
Installation / Fitting
• Tighten the fitting screws of the uprights with the crosspiece
• Check the anchoring of the door to the door frame
Motor
• Check the fixing of the motor to the relevant support
• Check the tensioning of the transmission chain
• Check the limit switches functioning and the good alignment with the cams.
• Check the brake disc wearing. If necessary replace the disc
• Check the properly manual release lever brake functioning (when applicable)
Main Shaft / Belt
• Check the good bearing supports fixing
• Lubricate the support of the bearings by suitable grease inlet
• Check the wear and tear of the counterweight belts and the curtain. Replace the belts if necessary
Safety Devices
• Check the good safety bar functioning
• Check the good conditions of the safety bar rubber profile
• Check the adjusting and the eventual wearing of the steel cable of the electromechanical safety edge
• Check the wearing of the mobile cable
• Check the correct operation of the safety photocells
9.1 Maintenance Plan
The table below shows the recommended interval - in months - when to replace parts during preventive maintenance.
Part
Limit switch group (if 400V)
Limit switch (if 400V)
Brake disc
Brake disc guide
Safety edge coiled cable
Belt counterweight and curtain
(1) Dirty or dusty environment, operating temperature near to 0°C or over 35°C, wind pressure within 20% of maximum limit.
Date
Conter
0DT829 2016-04-01
<10
Part number
Low Traffic
Months
6K10GF
36
5M
48
21572
36
21571
36
27795B
36
6KTFCS
36
Signature
- 50 -
Cycles / hour
<30
Medium Traffic
Months
24
36
24
24
24
24
Date
Conter
Abusive
>30
Environment
High Traffic
(1)
Months
12
12
24
24
12
12
12
12
12
12
12
12
Signature

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ditec traffic cm

Table des Matières