F- Maintenance - SCS Sentinel SG2 Notice D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Photocells
Detection Method
Sensing Range
Input Voltage
Response Time
Operation Indicator
Dimensions
Output Method
Remote controls
Channels
Frequency / Transmitted max. power
Power supply
Security

F- MAINTENANCE

Conduct the following operations at least every 6 months. If in high intensity of use,
shorten the period in between.
Disconnect the power supply:
(1) Clean and lubricate the screws, the pins, and the hinge with grease.
(2) Check the fastening points are properly tightened.
(3) Make the wire connection are in good condition.
Connect the power supply:
(1) Check the power adjustments.
(2) Check the function of the manual release.
(3) Check the function of photocells or other safety devise.
infrared beam
MAX~10m
AC/DC 12~24V
< 100ms
RX : Red LED On (beam broken) / Off (beam
aligned) TX : Red LED On
63 x 63 x 30 mm
relay Output
4
433.92 MHz / power < 10mW
2 batteries lithium CR2016 included
rolling code technology
EN
29

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Mba0051

Table des Matières