Installation Guide - TEMPUR-PEDIC 19005-38.80-3370 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation guide

STEP 1
Place the bed base box in a desired location with the
bottom of the box facing up.
Remove the binding straps and packing materials,
making sure not to puncture the box with any sharp
objects.
STEP 2
Remove the bed base from the box keeping the bottom
of the base facing upwards.
STEP 3
To install headboard brackets (sold separately), see
instructions on page 18.
Legs are shipped fully assembled. Alternative heights in 3"
increments can be achieved by removing leg segments.
To install the legs, thread the leg into frame, and tighten by
hand. Do not over tighten.
8
For Tempur-Pedic customer service call: U.S. 1-844-309-3597 | Canada: 1-800-887-4321 | México: 01-722-273-1810
Always use two people when setting up the base.
STEP 4
If installing a split unit, see page 17.
Locate the battery backup box
and install (2) 9-Volt batteries (not
included).
(For operating instructions see page
15).
STEP 5
Uncoil input power cord (connected
to control box's power port) and
plug into power supply.
STEP 6
Uncoil the power cord and connect to
the power supply. Place power supply
on the ground and extend from the
base. Ensure that the power supply
and all attached cords are directed
toward the desired surge protector.

Publicité

Table des Matières
loading

Table des Matières