Installation - Zanotti GM Série Notice De Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.5 Installation

Straddle version:
before mounting the unit prepare the cuts and holes in the cold room wall shown in the picture.
Fix the unit in place with the appropriate screws. Position the unit on the cold room, connect the evaporator
drain tray spigot and the hole prepared in the cold room wall using the supplied fitting with pre-inserted
heater (for low temperature units only). Secure with the appropriate screw.
Fill the hole in the wall with insulating material, polyurethane or silicone, and mount the hole cover.
Condensate drain line Ø 14
GM1
GM2
GM3-340
Thru-wall version (optional):
A) Prepare a opening with suitable dimensions in the cold room wall (see picture).
B) Position the unit onto the cold room wall inserting the evaporator section in the opening.
C) Fix the unit using the screws supplied.
24
Fitting
A
B
mm
mm
19
316
19
316
19
425
Inject silicone all
around the panel
opening
C
D
E
F
Condensate drain line Ø 28
C
D
mm
mm
288
83
503
83
503
83
E
C
E
A
E
F
mm
43
6
43
6
43
6
Hole
G
D
B

Publicité

Table des Matières
loading

Table des Matières