Assembling The Power Plug; Filling And Bleeding The System - WITA go.future LED 40 Série Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operating Instrutions

10.1 Assembling the power plug

Connect the power cable to the pump as shown. Caution: Line voltage! Observe the required
protective measures, national body regulations and local provisions at all times. The cable
cross-section may be no smaller than 0.75 mm2. Use ferrules if using fine-wire cables.

11 Filling and bleeding the system

34
WITA go.future LED 40-XX | 60-XX
1
3
2
The system must be filled and bled correctly.
To vent the pump the electronics should be set
to level III and run in this position for at least 20 minutes.
After this procedure, the pump can be adjusted to the
required method of control.
Incomplete bleeding will lead to noise
development in the pump and system.
Warning! Burning hazard!
Depending on the system operating mode,
the whole pump can become very hot.
2
Click
4
Click
Note

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Go.future led 60 série

Table des Matières