KOBE CH-122 Série Manuel D'installation Et Mode D'emploi page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

***This installation only applied with the purchase of a duct cover.
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.
-
A straight, short venting run will allow the hood to perform more efficiently.
-
Try to avoid as many transitions, elbows, and long run as possible. This may reduce
-
the performance of the hood.
Use duct tape to seal the joints between pipe sections.
-
If necessary, prepare back wall frame with cross framing lumber for secure installation.
-
Using references on Table 2 and measurements on Page 22-23, decide the level of the
-
lumber. Refer to Figure 22.
Hood Preparation before Installation
Temporarily wire the hood to test for proper operation before installing.
-
Peel protective film off the hood and the duct cover (if any).
-
Remove the screws on the vent cover (rear) and cut along the line of the inner vent
-
cover (rear) opening. Refer to Figure 23.
Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.
-
WALL MOUNT INSTALLATION – REAR VENT
Figure 21
Figure 23
Inner Vent
Cover (Rear)
15
Figure 22
Figure 24
Reversed
Vent Cover
(Rear)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch2230sqbCh2236sqbCh2230sqCh2236sq

Table des Matières