Télécharger Imprimer la page

Bosch Gravity-Rise T4B Consignes De Fonctionnement/Sécurité page 7

Support de scie à onglet
Masquer les pouces Voir aussi pour Gravity-Rise T4B:

Publicité

Les langues disponibles

Les langues disponibles

BM 2610027814 10-12_BM 2610027814 10-12.qxp 10/22/12 2:52 PM Page 7
Step 5
Attach Rail Assembly
1. Locate the rail assembly and assemble as
shown in figure 5.
2. Fold stand upright: Rotate release lever
down to clear locking pins. With both
hands on the handle, pull up and push
forward on the stand until it locks into the
upright position (see page 9).
3. Cut the strap restraining the support leg in
place. Make sure the support leg is sitting
on top of the base tube until the rail
assembly is fully secured.
4. Place one (1) 6mm flat washer (R) onto
one (1) 6mm x 45mm bolt (M).
5. Raise the rail assembly and align it with
the holes in the long rail support. Prior to
fastening the rail assembly, make sure the
fastener access window on the long rail
support and support link face down when
the stand is in its horizontal position.
6. Insert one (1) 6mm x 45mm bolt (M) with
6mm flat washer (R) through the holes of
the long rail support and the rail. Loosely
tighten with one (1) 6mm lock nut (U).
7. Repeat step 6 of this procedure for the
remaining three (3) hole locations in the
long rail support and the four (4) hole
locations in the support link assembly.
8. Securely tighten all eight (8) bolts.
Step 6
Secure Support Leg
1. Locate the support leg and secure as
shown in figure 6.
2. Place one (1) 10mm flat washer (P) onto
one (1) 10mm x 55mm Hex Head bolt (J).
3. Align the support leg with its hinge built
into the base tube.
4. Insert one (1) 10mm x 55mm Hex Head
bolt (J) with 10mm flat washer (P) through
the support leg hinge and support leg.
Place one (1) 10mm flat washer (P) and
tighten with one (1) 10mm lock nut (S).
Note: Do not over-tighten lock nut. These
parts need to freely rotate for stand to
operate properly.
FIG. 5
FIG. 6
-7-
Support
Leg

Publicité

loading