G-U SECURY 21 EK Notice De Montage page 46

Masquer les pouces Voir aussi pour SECURY 21 EK:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation instructions
SECURY 21 EK | 21 S
Multi-point locks electrically couplable or with monitoring contacts
If you use a cable duct, install it on the hinge side of the door to avoid
damage to the cable at any door position.
To permit unhinging of the door leaf, the connection of the cable duct to
the connecting cable on the hinge side must be easy to release.
Installation dimensions for SECURY 21 EK / 21 S
You will find on the customer drawings discussed below installation and
milling dimensions, approved hardware and strikers, strike plates/frames:
1-leaf doors (SECURY 2170 / 2178 / 2116 S):
2-leaf doors (SECURY 2171 / 2119 S):
We would be happy to provide you the drawings, if needed.
DE
46
EN
FR
ES
0-44427-L0-0
0-44525-L0-0
08.2013 | G27856 | Printed in Germany

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Secury 21 s

Table des Matières