Tank Assembly; Installation; Heating System Connection; Commissioning - Reflex Storatherm Heat HF Série Mode D'emploi

Masquer les pouces Voir aussi pour Storatherm Heat HF Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
5.3

Tank assembly

5.3.1

Installation

Remove the outer packaging and undo the screws with which the tank is screwed to the pallet.
Position the tank.
WARNING
Risk of injury due to tipping over of the device
Risk of bruising or crushing caused by tipping over of the device
Ensure sufficient stability of the device.
5.3.2

Heating system connection

ATTENTION
Device damage from overheating
Incorrect positioning of the safety valve will cause damage to the pipe connections.
Fit the safety valve between tank and non-return valve.
Do not close the safety valve vent.
6

Commissioning

The responsible installer must explain to the operator how the tank functions and how it is to be used.
He/She must draw attention to maintenance work that has to be carried out at regular intervals. The
service life and correct functioning of the tank are dependent on this. The tank must be emptied if
there is a risk of frost, or prior to its being removed from service.
6.1

Filling the tank

Proceed as follows when filling the tank:
1.
Connection to the heating system.
2.
Filling of the tank and system.
3.
Venting of the tank and system.
4.
Checking of the leak-tightness.
Storatherm Heat — 23.02.2021
Commissioning
English — 19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Storatherm heat h série

Table des Matières