Commissioning
Putting the device into operation
Prerequisite
– The function tests were performed successfully.
– The device is installed correctly.
1
Remove the spray shield.
1
2
Clean the device.
36028798881172363-1 © 05-2017
967.304.00.0 (01)
3
Close the WC seat and WC lid.
4
Mount the design cover.
5
Remove the protective foil from the design
cover.
2
Result
ü The device is ready for operation and can be
handed over to the customer.
EN
35