Télécharger Imprimer la page

RDI TITAN PRO RAIL Instructions D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

LEVEL RAIL CONTINUED
3.
Transfer these marks to the top rail and cut
(Figs. 9, 10).
Locate and mark the center point on the
underside (unrouted side) of the bottom rail.
Attach the rail support to the bottom rail as
shown below (Fig. 11) using the supplied set
screw (H).
4
4.
Lay the bottom lineal on a clean, non-
abrasive surface (Fig. 12). Orienting the tabs
(Fig. 13) to engage the aluminum stiffeners,
insert a tabbed baluster into the second
routed hole from each end.
Distribute the remaining tabbed balusters
evenly throughout the section. Then connect
the top lineal (Fig. 14).
(Fig. 9)
(Fig. 10)
(Fig. 11)
5.
NOTE: Mounting brackets are supplied
pre-mounted to all posts for level railing
installations. Stair mounting brackets are sold
separately. Check post box contents for details.
If using Titan posts with pre-mounted
brackets, skip to Step 6. If installing Titan
brackets, attach brackets as shown in Figure
15. To achieve a 2" bottom space from
mounting surface to the bottom of the rail,
center and align bottom bracket 1
mounting surface. For a 36" finished top rail
height, center and align top bracket 33
from mounting surface. For a 42" finished top
rail height, center and align top bracket
39
13
/
" from mounting surface.
16
The bracket attachment screws provided
with the bracket kits are meant to be used in
conjunction with Titan Pro blank posts and
when installing vinyl sleeves over 4" x 4" wood
posts. For Titan Pro blank posts, use the 1"
(Fig. 12)
long size 10 Phillips metal screws provided.
For wood posts, use the 2" long size 8 square
drive wood screws provided.
(Fig. 13)
Tab
(Fig. 14)
13
/
" from
16
13
/
"
16
(Fig. 15)

Publicité

loading