Télécharger Imprimer la page

Lovato BIG EXOL AR2 Mode D'emploi page 23

Publicité

Les langues disponibles

Les langues disponibles

The installation and any intervention onto the module must be carried out in compliance with local regulations and laws, craftsmanlike and according to rules given for
water usage.
Heating systems in buildings – Design for water-based heating systems
DIN 4753
Water heaters, water heating installations and storage for drinking water
VED 0100
Low voltage electrical equipments
VDE 0185
Safety electrical devices
VDE 0190
Electrical equipments – Equipotential connection
- All interventions on the module are to be done with disconnected mains power source.
- The installation and the related modifications are to be carried out by a specialized technician who will be personally responsible for the correct mounting
and start up of the system.
- The installation in dry place, with no frost risk and ambient temperature below 40 °C is strongly recommended.
In order to avoid any unnecessary waste of energy, the placement of this module as close as possible to intermediate tank is recommended. The used surface must be
adequate to module's weight.
In order to avoid any unnecessary mechanical stress, carefully regulate standing supports.
UP
RS
MS1
All hydraulic connections must comply with given instructions. You are strongly advised to keep the length of the pipes between module
and the puffer to a minimum.
Avoid the coupling of materials that may generate voltage sources and electrochemical corrosion consequently.
! !
Tighten all fittings nuts only after the complete placement and connection of the pipes.
Danger
Any intervention on preassembled piping is not allowed !
22004022 - 06.13
3. Safety precautions
4. Hydraulic connection – Connections and dimensions
IP
MS2
Assembling instructions and maintenance
IP
primary delivery (solar)
UP
primary return (solar)
MS1
secondary delivery 1
MS2
secondary delivery 2
RS
secondary return
Connections
IP
BIG EXOL-AR2
1½" F
Dimensions :
Height
1140 mm
Width
1000 mm
Depth
500 mm
It is recommended to keep the area around the device free from
obstructions for at least 50cm in order to able to make inspections
and maintenance easily.
UP
MS1
MS2
RS
1½" F
1½" F
1½" F
1½" F
23

Publicité

loading