Installation; Removing The Packaging Reinforcements; Removing The Transit Bolts - essentiel b ELF1014-2b Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

installation

The client is responsible for preparing the location and for the installations connected
to the electricity, water supply and drains on the installation site.
Check that the water supply and drain hoses and the power cord are not kinked,
pinched or crushed when you push the product into its place, after the installation or
cleaning procedures.
Ensure that the installation and electrical connections for the appliance are carried
out by an approved maintenance agent. The manufacturer shall not be held liable for
damage resulting from work carried out by unauthorized personnel.
Prior to installing, check whether the product has any defects. If you identify any, do
not install the appliance. Damaged products present a risk to your safety.
Removing the packaging reinforcements
Tilt the washing machine backwards to remove the packaging reinforcement. Remove
the packaging reinforcement by pulling on the band. Do not perform this operation on
your own.
Removing the transit bolts
Four transit bolts are screwed into the rear of the washing machine in order to guarantee
it is transported in complete safety.
38

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elf1014-2n

Table des Matières