Télécharger Imprimer la page

Yamaha Motor F100A Manuel D'entretien page 172

Publicité

POWR
Å
A
TIMING BELT
ı
Driven sprocket installation
1. Install:
Driven sprocket bolt
Driven sprocket bolt:
60 Nm (6.0 m • kg, 43 ft • lb)
Flywheel holder:
YB-06139/90890-06522
Å For USA and CANADA
ı For worldwide
Timing belt installation
CAUTION:
Never forcefully twist, turn inside out, or
bend the timing belt.
Do not let oil or grease get onto the tim-
ing belt.
A Minimum 25 mm (1.0 in)
1. Install:
Timing belt
Tensioner
Installation steps:
Align ø6 hole on the pickup rotor with
the notch in the cylinder block.
Align the marks "
sprockets with the top edge of the cyl-
inder head.
Install the timing belt onto the driven
sprockets and drive sprocket.
Install the tensioner.
Tensioner bolt:
40 Nm (4.0 m • kg, 29 ft • lb)
Turn the crankshaft clockwise two
times
and
sprocket and driven sprockets are cor-
rectly aligned with the marks.
5-14
" on the driven
make
sure
the
E
drive

Publicité

Chapitres

loading

Ce manuel est également adapté pour:

F100x