Télécharger Imprimer la page

Amann Girrbach steamer X3 Instructions De Service page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

should not be stored in a closet. To use Steamer X3
as a wall instrument, the instrument must be
mounted to the desired wall.
A mounting template has been provided which
can be used to mark the drilling points on the
wall in a quick and precise manner. For wall
mounting, check beforehand that the selected
wall can support the weight of the instrument
and that there is sufficient space above it to fill
the boiler.
Wall MOuntIng the InstruMent
_ Firstly check that the wall chosen for the
mounting of the Steamer X3 is stable and strong
enough to sustain its weight (no plaster walls,
etc.). WarnIng: Special toggle bolts must be
used for plasterboard walls!
_ Place the mounting template in the desired
position. WarnIng: Leave enough space above
the instrument so that the boiler can be filled.
Make sure that the holes are horizontally aligned
(check using a level). Mark the 4 points for the
holes and proceed with the drilling.
_ Insert the relative toggle bolt nuts into the holes
(use only special toggle bolts for plasterboard
walls!).
_ Tighten the 4 screws to a depth of approximately
6 mm, then secure the instrument to the wall.
WarnIng! the manufacturer is not responsible
for any damage caused by installation that is
not performed in a proper fashion.
O P e r at I n g I n s t r u C t I O n s
usIng the steaMer FOr the
FIrst tIMe
Connect the electrical power cord
instrument. Make sure that the power switch
is in the 0 position (OFF) and insert the plug into
the electrical outlet. Check that the drainage
screw
is inserted in the bottom of the instrument
(
(the drainage screw is positioned transversely
with respect to the drainage flow). Remove the
safety cap
and fill the boiler with cold water
^
through the filler neck. The boiler has an excess
discharge tube so that it cannot be overfilled.
Remove any excess water through the filler neck.
do not fill the boiler with chemicals or other
additives.
Important:
Close the filler neck by tightly screwing on the
safety cap
. Turn the instrument on using the
^
power switch
found on the left side. The
!
heating system will turn on automatically. The
red indicator light
will be on while the instrument
$
is in the heating phase. After approximately
20 minutes, the Steamer X3 will reach the
necessary vapor pressure and is ready for use,
which is indicated by the lighting of the green
light
. The red indicator light
#
will turn off.
to the
@
!
for the heater
$
11
gB

Publicité

loading

Produits Connexes pour Amann Girrbach steamer X3

Ce manuel est également adapté pour:

116910