Télécharger Imprimer la page

HOLZMANN MASCHINEN FS 160L Mode D'emploi page 9

Masquer les pouces Voir aussi pour FS 160L:

Publicité

Les langues disponibles

Les langues disponibles

3. ASSEMBLY
DELIVERY CONTENT
The machine is shipped partly disassem-
bled. When you unpack the machine check
it for: Transport damages
Please report transport damages immedi-
ately to the forwarding company that de-
livered the machine to you, filing a freight
claim.
Hidden Transport damages shall be re-
ported immediately after discovering it,
but latest 48h after machine delivery.
When unpacking check the delivery con-
tent:
spindle ring
table ring
fence assembly
change spindle with
12mm router collet
sliding table
main machine body
TRANSPORT & UNPACKING
While transporting or handling the ma-
chine, be most careful and let this activity
be
done by qualified personnel especially
trained for this kind of activity.
While the machine is being loaded or un-
loaded, make sure that no person or sub-
ject gets crushed by the machine !
Do not enter the area under the machine
lifted by a crane or a high-lift trolley!
See Fig. B:
The machine or its individual parts may
only be lifted by means of an approved
lifting device with verified lifting capacity.
Prepare a high-lift truck (D) or a manual
lifting carriage (F) with sufficient lifting
capacity,
- put the forks (G) below the machine,
as shown in the picture.
Should you use a crane (E) or a similar
hoisting equipment, proceed as follows:
- prepare four lifting belts (H) or steel
ropes at least 2 m long with sufficient
lifting capacity,
- fix the ropes to the hook of the crane
with the required capacity,
- place the other end of the ropes on
the lifting rods put under the machine
(rods are not part of delivery),
- after lifting the machine slightly, check
the stability of the machine hanging on
the ropes.
18pcs
2pcs
1pcs
1pcs
1pcs
1pcs
- lift the machine carefully and slowly and
then move it without any rapid changes of
the movement to the selected place.
CONNECTION OF THE EXHAUSTING
SYSTEM
See Fig. C:
Work on the machine only with the ex-
haustion system connected and running!
For the proper functioning of the machine,
exhaustion equipment with minimum ex-
haustion capacity of 570 m3/hour and
minimum speed of air in the pipes equal
to 20m/sec for dry particles and 790 m3/
hour and minimum speed of air in the
pipes equal to 28m/sec for wet particles
is necessary.
Switch on the machine drive and exhaus-
tion system at the same time!
Use flexible exhausting hoses with diame-
ters equal to 100 mm The exhausting hose
is connected to exhausting outlet whose
location on machine is as follows:
For the moulding machine the exhaust-
ing hose is fitted onto the outlet from the
moulding tool cover which also forms the
exhausting connector (A). The hose diam-
eter is 100 mm.
CONNECTION TO POWER SUPPLY
Damaged power supply cables must be
replaced by the competent specialist im-
mediately. Operation with damaged ca-
bles is dangerous to life and is therefore
forbidden!
Before putting the machine into operation
make sure that the voltage and frequency
specified on the machine type plate com-
ply with the values of the mains to which
it is connected.
Overvoltage protection shall be provided
by the end user.
Before adjustment and replacement of
tools and before any adjustment work, al-
terations and maintenance work, always
turn off the switch and disconnect the plug
from supply socket.
This machine must be grounded. Inspect
and be sure that the power socket of your
workplace is reliably grounded.
If you do not have the specific knowledge
and experience, let the electric connection
be checked by a certified electrician!

Publicité