Télécharger Imprimer la page

Parameter Setting - Tabuchi Electric EHW-S55P3B-PNUS Manuel D'installation

Onduleur solaire hybride
Masquer les pouces Voir aussi pour EHW-S55P3B-PNUS:

Publicité

Les langues disponibles

Les langues disponibles

Parameter Setting

To change the initial parameter settings, go through the following steps.
1
Restart the system if the system is not running.
① See Page 11 and remove the front panel of the Hybrid Solar Inverter and the base.
Confirm that the solar panel switch on the outside of the inverter is in the OFF position.
② Open the switch cover on the storage battery unit and set the switch to the ON position.
③ Set the grid-tied breaker to the ON position.
(When the inverter is tied to the grid through a secondary feed, set the main breaker to the ON position, as well.)
Confirm that the terminal voltage of the grid-tied breaker and main breaker is 120/240 V.
2
Set the Remote Controller to the Service Mode.
① From the Home Screen, confirm that stand-alone and grid-tied
operation are manually stopped.
② Press and hold the [SETUP] and [RECORD] buttons for 5 seconds
or more to enter the Service Mode.
③ Caution Message is displayed, press [ENTER].
3
Set parameters.
① From the SERVICE MODE 1/2 screen, select "SETTING VALUE"
and press [ENTER].
② Press [↓], select "IEEE" or "HECO", and then press [ENTER].
Press [ENTER] to display
"IEEE" or "HECO" under
subsequent settings screens.
Press and hold both buttons for
5 seconds or more.
31

Publicité

Chapitres

loading