Epson EB-1410Wi Guide D'installation page 18

Masquer les pouces Voir aussi pour EB-1410Wi:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(2) Attach the slide plate to the projector.
Attach the slide plate to the projector using the M4 x 12 mm hexagon socket head cap bolts (x4)
supplied.
Slide plate
(3) Attach the 3-axis adjustment unit to the setting plate.
• Decide which position you want to install the 3-axis adjustment unit.
Mount it at the
stamp when the screen is 70 inches or more.
: Less than 70 inches
• Tighten the M4 x 12 mm hexagon socket head cap bolts (x4) supplied to install the 3-axis adjustment
unit.
M4 x 12 mm hexagon
socket head cap bolts
Spring washer
Washer
Bolt installation positions
When the projection screen is less than 70 inches
stamp when the projection screen is less than 70 inches, or mount it at the
: 70 inches or more
When the projection screen is 70 inches or more
18
M4 x 12 mm hexagon socket head
cap bolts
Spring washer
Washer

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Eb-1400wi

Table des Matières