Electrical Work - Mitsubishi Electric Mr. SLIM PUHZ-RP-HA4 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
6. Electrical work
6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-.
* Except PEA-RP00, 50, 400, 500GA
S1
S2
S3
B
L N
S1
S2
S3
D
For Power
For Power
D
B
E
* In case of PEA-200, 250
PUHZ-200, 250
* In case of PEA-400, 500
(No.1 Outdoor)
PUHZ-200, 250
(No.2 Outdoor)
PUHZ-200, 250
* In case of PEA-200, 250
10
A
A Indoor unit
B Outdoor unit
C Remote controller
C
D Main switch (Breaker)
E Earth
A
A
C
E
Fig. 6-1
PEA-200, 250
PEA-400, 500
T (
B
- 4
) 1
T (
B
- 4
) 2
* In case of PEA-400, 500
Fig. 6-3
RP35, 50
RP60-250
A
E
F Termial block
G Indoor/Outdoor connection terminal block (S1, S, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
RP35, 50
RP60-140V
L N
S1 S2 S3
RP100-250Y
L1 L2 L3 N
S1 S2 S3
Fig. 6-2
Power supply
Earth leakage breaker
Circuit breaker or local switch
LCD remote controller
Outdoor unit
Indoor unit
Power cable wiring
Indoor/outdoor connection wiring
Grounding
Main remote controller
Subordinate remote controller
Standard (Refrigerant address = 00)
Refrigerant address = 01
Refrigerant address = 02
Refrigerant address = 03
Refrigerant address = 14
Refrigerant address = 15

Publicité

Table des Matières
loading

Table des Matières