Télécharger Imprimer la page

Mitsubishi Electric MXZ-3C24NA2 Notice D'installation page 4

Masquer les pouces Voir aussi pour MXZ-3C24NA2:

Publicité

Les langues disponibles

Les langues disponibles

-5. INSTA
ATI N DIAG AM
Open as a rule
(500 mm) if the front and
both sides are open
More than
(100 mm)
Open as a rule
are open
utdoor unit installation
Air inlet
Air inlet
Air outlet
ing material tightly so that there
is no gap.
When the piping is to be attached to
a wall containing metals (tin plated)
or metal netting, use a chemically
and the piping or wrap 7 to 8 turns
the piping.
To use existing piping, perform
according to the dimension for new
refrigerant.
are obstacles to both sides
2-U-shape notched holes
2 - 12 × 22
Unit : inch
PA TS T
BE P
-
(A) Power supply cord*
(C) Extension pipe
(D)
(E) Piping tape
(F)
(G) Refrigeration oil
Putty
(I)
Fixing screw for (I)
(L)
* Note:
to be used per indoor unit.
Units should be installed by licensed contractor according to
local code requirements.
utdoor unit installation
950
174
600
Air inlet
Air inlet
Air outlet
IDED AT
U SITE
1
1
1
1
1
1
Little
amount
1
2 to 7
2 to 7
1
1
2-U-shape notched holes
Unit : mm

Publicité

loading

Ce manuel est également adapté pour:

Mxz-3c30na2Mxz-4c36na2